Pebble Tec: Tahoe Blue
Tile: Aztec 603
Rock Work: Sharp Cut Faux
Coping: Utah Sunrise
This pool was a tough one to get going. Because of the City codes, we had to get a soils report on this job. However, due to some soil failure in the past, red flags were thrown up in the report which delayed the whole project. Long and short of it, we weren't sure if we were going to be required to put in caissons in order for the pool to get permitted, which cost more than the pool was worth. But after some debate, it turned out caissons were not needed. Instead, we had to overexcavate and pour a secondary floor which was still more than expected, but not the worst case scenario. Once started, we got the job done in 10 weeks. It fit perfectly into their backyard. The sharp-cut stone matched well with other natural boulders throughout the yard.